L'Atlas / Serveurs MCP / McpStamp Change Orders
Serveur MCP

McpStamp Change Orders

io.github.theluckystrike/change-order

Serveur MCP OK 11 outils

Faire examiner Voir les tarifs

Change orders against quotes and work orders: line changes, approval, running contract value.

Fiche technique

Auteur
theluckystrike (espace de noms du registre)
Dépôt
github.com/theluckystrike/mcp-servers
Site
www.mcpstamp.com/servers/change-order
Version
0.23.0
Transport
Streamable HTTP stdio
Authentification
Aucune (constatée par notre test)
Adresse du serveur
https://mcp.zovo.one/mcp/change-order Streamable HTTP
Paquets
https://github.com/theluckystrike/mcp-servers/releases/download/v0.22.0/change-order.mcpb 0.21.0 mcpb stdio
Outils
11
Catégories
—
Dernière mise à jour
2 nov. 2026
Publication
2 nov. 2026

Badge pour votre README

Référencé sur L’Atlas

Gratuit, pour toute fiche. Il renvoie vers cette fiche et affiche « testé OK » tant que notre dernier test est réussi.

MarkdownREADME.md
[![Référencé sur L’Atlas](https://latlas.dev/badge/fiche/io.github.theluckystrike/change-order.svg)](https://latlas.dev/mcp/io.github.theluckystrike/change-order)
HTML
<a href="https://latlas.dev/mcp/io.github.theluckystrike/change-order"><img src="https://latlas.dev/badge/fiche/io.github.theluckystrike/change-order.svg" alt="Référencé sur L’Atlas" height="20"></a>

Nos tests

Chaque semaine : initialize puis tools/list, sans identifiant, sans jamais appeler d’outil. Méthode

Adresse
https://mcp.zovo.one/mcp/change-order
Dernier résultat
OK 28 nov. 2026, 11:12
Temps de réponse
1 082 ms (initialize + tools/list)
Version du protocole
2025-11-25
Nom annoncé
mcp-change-order 0.22.6
Outils
11

Historique

DateRésultatRéponseOutils
28 nov. 2026, 11:12OK1 082 ms11

Outils exposés (11, réponse à tools/list, 28 nov. 2026)

change_order_create

Raise a change order

Raise a change order against a quote or work order and return its CO-YYYY-NNNN number: the reference, the client, a title, the date, and the original contract value in minor units. Free tier: 5 open.

ParamètreTypeRequisDescription
referencestringouiThe quote or work order this change order is against, by its id, e.g. Q-2026-0003 or WO-2026-0001
reference_kindenum: "quote" | "work_order"nonWhat the reference is. Inferred from the id when omitted: WO-... is a work order, anything else a quote
clientstringouiThe client the change is agreed with, as named on the quote or work order
titlestringouiWhat the change is, in one line, e.g. Add a second landing page and drop hosting
datestringnonThe day the change was raised, YYYY-MM-DD. Default today
currencystringnonISO code the contract is priced in. Defaults to the shared business profile's currency
original_value_minorintegernonThe contract value BEFORE any change order, net of VAT, in whole minor units. Required on the first change order against a reference; inherited by every later one
notestringnon
duplicate_okbooleannonRaise it even though an identical change order exists on this reference. Default false

change_order_add_line

Add a changed line

Add one line to a draft change order: added or removed with a quantity and a unit price in minor units, or changed with the old and the new quantity and price, each with a reason and a date. Free.

ParamètreTypeRequisDescription
change_orderstringouiThe change order id, e.g. CO-2026-0001, or its title when only one carries it
kindenum: "added" | "removed" | "changed"ouiadded for new work, removed for work taken out, changed for a line whose quantity or price moves
descriptionstringouiThe line as it reads on the quote or work order, e.g. Website audit
quantitynumberouiadded or removed: how many. changed: the NEW quantity
unit_price_minorintegerouiadded or removed: the unit price in whole minor units. changed: the NEW unit price. 45000 is EUR 450.00
was_quantitynumbernonchanged only: the quantity before the change
was_unit_price_minorintegernonchanged only: the unit price before the change, in whole minor units
reasonstringouiWhy, in the client's words if you have them, e.g. Client asked for a second page after the kickoff
datestringnonThe day the change was asked for, YYYY-MM-DD. Default the change order's date
tax_ratenumbernonVAT percent for this line, overriding the shared profile's default
notestringnon

change_order_status

Move a change order along

Move one change order along and stamp the date and note: draft to sent, sent to approved or rejected, either to void. Backwards steps, an unsent approval and a backdated move are all refused.

ParamètreTypeRequisDescription
change_orderstringouiThe change order id, e.g. CO-2026-0001, or its title when only one carries it
statusenum: "draft" | "sent" | "approved" | "rejected" | "void"ouiThe status to move to
datestringnonThe day it happened, YYYY-MM-DD. Default today
notestringnonWhat happened, e.g. Emailed to the client, or Approved by phone, confirmed in writing

change_order_get

Show one change order

Return one change order in full by CO number or client: every added, removed and changed line with its reason and delta, VAT, delta gross, the status history and the running value. change_order_list finds the id.

ParamètreTypeRequisDescription
change_orderstringouiThe change order id, e.g. CO-2026-0001, or its title when only one carries it

change_order_list

List change orders

List change orders newest first with status, reference, client, currency and net delta, and above them the APPROVED and the pending delta per currency, kept apart. Filter by reference, status, client, date.

ParamètreTypeRequisDescription
referencestringnonOnly change orders against this quote or work order
statusenum: "draft" | "sent" | "approved" | "rejected" | "void" | "open"nonOne status, or open for draft and sent together
clientstringnonOnly change orders whose client name contains this text
fromstringnonEarliest date, YYYY-MM-DD
tostringnonLatest date, YYYY-MM-DD
limitintegernonMaximum rows returned, default and ceiling 500

change_order_delete

Delete an empty draft

Delete a DRAFT change order with no lines, freeing an open slot. One sent, approved, rejected or voided is refused, and so is one carrying lines: void it with change_order_status instead. The number is not reissued.

ParamètreTypeRequisDescription
change_orderstringouiThe change order id, e.g. CO-2026-0001, or its title when only one carries it

contract_value

Running contract value

The running value of one quote or work order: original, approved deltas and current value, with pending draft and sent deltas kept apart. Net of VAT. A reference with no change order is refused.

ParamètreTypeRequisDescription
referencestringouiThe quote or work order this change order is against, by its id, e.g. Q-2026-0003 or WO-2026-0001

change_order_document

Change order document

Render one change order as a plain-text document for the client to approve: every line with its reason, the delta net and gross, the contract value before and after, and an approval block. The same text also comes back as a .txt download link valid for one hour. Pro.

ParamètreTypeRequisDescription
change_orderstringouiThe change order id, e.g. CO-2026-0001, or its title when only one carries it

change_order_invoice_payload

Invoice payload for an approved delta

Build the approved delta as invoice_create-ready items in MAJOR units and quote_create-ready items in MINOR units, with VAT at the shared profile rate. Writes nothing and creates nothing. Pro.

ParamètreTypeRequisDescription
change_orderstringouiThe change order id, e.g. CO-2026-0001, or its title when only one carries it
issue_datestringnonThe invoice issue date, YYYY-MM-DD. Default today
tax_ratenumbernonVAT percent for lines with no rate of their own, overriding the shared business profile's default

license_status

License status

Report this endpoint's licence state for your token as JSON: the product, the tier free or pro, why it is not Pro, and the checkout URL. Call it to explain a free-tier refusal. No arguments, nothing changes.

Aucun paramètre.

license_activate

Activate license

Turn Pro on for this connection with key, an MCPL1. . issued at checkout for this server or the bundle. Data under your token stays; a wrong or expired key changes nothing. license_status confirms it.

ParamètreTypeRequisDescription
keystringouiLicense key from checkout, MCPL1. .

Compatibilité clients

Selon les transports que chaque client déclare accepter dans sa documentation officielle ; ce n’est pas un essai réel dans le client.

ClientTransports documentésCe serveurSource
Claude Codestdio Streamable HTTP SSEtransport acceptédoc
Claude (claude.ai, Claude Desktop, Cowork)stdio Streamable HTTP SSEtransport acceptédoc
ChatGPT (serveurs MCP personnalisés / plugins)Streamable HTTP SSEtransport acceptédoc
Cursorstdio Streamable HTTP SSEtransport acceptédoc
VS Code (GitHub Copilot)stdio Streamable HTTP SSEtransport acceptédoc
Windsurf (documentation redirigée vers Devin Local / Devin CLI)stdio Streamable HTTP SSEtransport acceptédoc
Gemini CLIstdio Streamable HTTP SSEtransport acceptédoc
OpenAI Codex (CLI, extension IDE, app)stdio Streamable HTTPtransport acceptédoc

Configs prêtes à copier

Adresse distante utilisée : https://mcp.zovo.one/mcp/change-order. Formats repris de la documentation de chaque client.

Claude Code
claude mcp add --transport http change-order https://mcp.zovo.one/mcp/change-order
Claude (claude.ai, Claude Desktop, Cowork)
Customize > Connectors > + Add > Add custom connector ; Name : change-order ; URL : https://mcp.zovo.one/mcp/change-order
ChatGPT (serveurs MCP personnalisés / plugins)
chatgpt.com/plugins > + > Add custom MCP server ; Name : change-order ; Server URL : https://mcp.zovo.one/mcp/change-order ; Create as a plugin
Cursor.cursor/mcp.json (projet) ou ~/.cursor/mcp.json (global)
{
  "mcpServers": {
    "change-order": {
      "url": "https://mcp.zovo.one/mcp/change-order"
    }
  }
}
VS Code (GitHub Copilot).mcp.json à la racine du workspace, ou ~/.copilot/mcp-config.json ($COPILOT_HOME/mcp-config.json)
{
  "mcpServers": {
    "change-order": {
      "type": "http",
      "url": "https://mcp.zovo.one/mcp/change-order",
      "tools": ["*"]
    }
  }
}
Windsurf (documentation redirigée vers Devin Local / Devin CLI).devin/mcp_config.json (projet), .devin/mcp_config.local.json (local), ~/.config/devin/mcp_config.json (utilisateur)
{
  "mcpServers": {
    "change-order": {
      "url": "https://mcp.zovo.one/mcp/change-order"
    }
  }
}
Gemini CLI~/.gemini/settings.json (utilisateur) ou .gemini/settings.json (projet)
{
  "mcpServers": {
    "change-order": {
      "httpUrl": "https://mcp.zovo.one/mcp/change-order"
    }
  }
}
OpenAI Codex (CLI, extension IDE, app)~/.codex/config.toml (ou .codex/config.toml pour un projet de confiance)
[mcp_servers.change-order]
url = "https://mcp.zovo.one/mcp/change-order"

Citer cette source

Vous rédigez un article ou un comparatif ? Cette fiche distingue les informations du registre et nos mesures. Citez le lien permanent et la date du test ; un résultat OK ne constitue pas un audit de sécurité ni une garantie de disponibilité.

McpStamp Change Orders · L’Atlas · Test du

Markdown
[McpStamp Change Orders — L’Atlas](https://latlas.dev/mcp/io.github.theluckystrike/change-order)
Méthode et limites des tests

Source : Registre officiel MCP · relevé le 30 nov. 2026. L’Atlas n’ajoute aucune donnée qui ne vienne de cette source ou de ses propres tests.